This prestigious retail project involved designing, manufacturing and installing a range of different products in multiple buildings, over an 18 month period of construction. Being such a long-term project, it was possible to site measure 90% of the work prior to fabrication. One of the biggest challenges we faced with this project was gaining access to install some of the large items, such as the street front awning.
Scope of works:
- Awning to street eastern side
- Hand rails to balconies
- Fence panels
- Gates